Processing provides the initial development pathway while Jimbe Minerals continues to advance its wider portfolio of copper assets through disciplined exploration, technical work and phased project development.
Jimbe Minerals has secured exclusive access to qualifying copper-bearing material from the Mushishima Tailings as the initial feedstock base for its Phase 1 processing operation, subject to applicable contractual, technical, environmental and regulatory requirements.
The indicative quantity of material covered by the feedstock arrangement is more than 35 million tonnes. This figure remains subject to continued verification, sampling, assay and technical assessment.
Jimbe is developing a phased copper processing operation based initially on the recovery of copper from existing tailings — above-ground material that has already been mined and processed historically.
About the Processing Plant →Jimbe is developing a modular copper processing operation designed initially around the recovery of copper from existing tailings.
The opportunity is based on material that is already above ground, reducing the need to begin the initial production strategy with conventional primary mining.
Tailings → Jimbe Plant → Feed Preparation → Copper Recovery → Copper Concentrate → Downstream Copper Production
Phase 1 is currently in development, with technical verification, metallurgical testwork and engineering progressing toward a defined processing configuration.
Concentrate produced is intended for downstream copper production, supported by offtake arrangements in place for the Company's production.
Explore the Processing Plant →Figures are indicative management planning assumptions and remain subject to continued verification, metallurgical testwork and engineering validation. They are not a Mineral Resource or Mineral Reserve estimate.